Model |
EB808A |
Engine Model |
1E40F-5B |
Displacement |
42.7cc |
Engine Power |
1.25kw/7000r/min |
Carburetor |
Diaphragm type |
Fuel tank capacity |
1.3L |
Flow |
0.2cbm/s |
Outlet speed |
73m/s |
Mixed fuel ratio |
25:1 |
N.W./G.W. |
8kg/9.2kg |
Packing size |
430390x460mm |
Qty/20‘ |
390pcs |
Qty/40‘HQ |
900pcs |
It is mainly used for urban road cleaning, cleaning road leaves, road dust, garbage, weeds after lawn leaves pruning, etc. It can also be used for sanitation cleaning in family yards, residential communities, schools, hospitals and other enterprises and institutions.
1. The air volume is moderate, the operation is simple, efficient and convenient, and the structure is more compact.
2. Reshape the appearance in all directions, the whole machine is beautiful and elegant, the back pad is comfortable to use, and the work is efficient.
3. The wind speed, air volume and direction are adjustable, which can blow off the dust in the tiny gaps.
4. Low fuel consumption, moderate noise and good emission effect.
5. The product is reliable and durable, and the maintenance is simple and convenient.
Shandong jinao machinery co.ltd is a professional manufacturer of garden tools. We professional produce high quality mist duster, leaf blower, brush cutter, water pump, earth auger and spare parts, etc.
As a major supplier with rich experience, we can satisfy different customers needs and provide wonderful solution. Warmly welcome foreign customers come to discuss cooperation with us for common development, mutual benefit and win-win.
FAQ
Q1: Wher is your factory located? How can I visit there?
A: Our factory is located in Linyi City, Shandong Province, China. You are warmly welcome to visit us whenever you are available.
Q2: Is sample available? and sample time?
A: Yes, samples of most products could be provided, but international courier costs to be borne by clients.3-7 days for sample time.
Q3: What is the term of payment?
A: As general, 30% T/T deposit and balance before shipment.
Q4: What is delivery time?
A: In general, within 25 days. It also depends on the order quantity and product.