Timber beam column formwork is used for the concrete pouring of Column. The application of column box formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality.
The system has four parts: plywood, timber beam , steel waling and Pull-push props. Pull-push props can be designed according to the project or simply selec the scaffold. Tie-yoke and tie-rod are used to reinforce the corner.
Timber Beam Column Formwork
Timber Beam Column Formwork is used for the concrete pouring of square or rectangle column.
Adjustable column formwork
The adjustment of adjustable column formwork is realized by changing the steel waling relative position.
Standard specifications
The steel waling of standard adjustable column formwork has three specifications. This can satisfy the need of concreting of column with side length from 200mm to 1200mm.
The length of steel waling(mm) |
The size of column(mm) |
1500~1800 | 800~1200 |
1200~1500 | 400~800 |
900~1200 | 200~400 |
When the steel waling are 1200~1500 mm long, we can adjust the section dimension from 800800mm to 400400mm or any size column with side length from 400mm to 800mm, square or rectangle.